0
Site survey, installation, commissioning and testing of a pass through warewashing machine.
Installation by a qualified service provider for your new dishwasher. Installation includes connection to existing services, commissioning and testing.
An industry approved electrical connection point, water supply and drainage of sufficient specification, as indicated in the appliance technical info, must be available within 1 metre of the appliance siting
Labour to install, commission and test 3-4 hours
Services must be easily accessible. The installation does not include cutting through any work surfaces/walls to run services through
Installation work carries a warranty period of 7 days unless there are exceptional circumstances
You can check the Specification tab for more details.
Only logged in customers who have purchased this product may leave a review.
© 2026 www.ladletongsmixer.com. All rights reserved.